
The project adopts a differentiated layout strategy, deploying a dual-base photovoltaic system with a total capacity of 270MW. This comprises a 150MW base at Lianchuang Hantaichuan North and a 120MW base at Lianfa Sidaoliu, designed to meet the daily energy replenishment needs of 700 and 600 electric heavy-duty trucks and mining trucks respectively. This scaled layout directly addresses the industry's pain point of "oversized stations leading to waste, undersized stations falling short." With a total annual power generation exceeding 350 million kilowatt-hours, it achieves the optimal allocation of PV-storage-charging resources.

